2005-08-27: 03:40 UTC  
Data center power outage
The datacenter where our racks are located lost power to the
first floor around 2230 EST (0330 UTC) taking out most carriers
in the center. Power was restored to the first floor around
2300 EST (0400 UTC).
An update will be posted when we know more about what caused the
power outage and what steps will be taken to prevent future
occurances.
2005-08-17: 22:10 UTC  
Scheduled Maintenance Thursday, Aug 18
Between 0100 and 0130 EDT, 0500 and 0530 UTC, our colocation
provider will be testing failover to backup circuits. There
will be a few periods of routing instability during this period.
We do apologize for the inconvience this will cause for some
customers.
2005-08-06: 16:40 UTC  
Scheduled Maintenance Sunday, Aug 7
Between 0100 and 0200 EDT, 0500 and 0600 UTC, our colocation
provider will be upgrading line cards in one of the border
routers. We do apologize for the inconvience this will cause
for some customers.